Moved post-build validation and packaging into a dependency-aware graph, reducing average PR build time by approximately 8.3% against a 30-minute reference build.

My contribution

I migrated post-build validation and packaging into a dependency-aware build graph so independent tasks could run in parallel. The average PR-build time reduction was approximately 8.3% when expressed against a 30-minute reference build.

The engineering concern

Parallel execution is useful only when the pipeline still respects dependency order. This work connects developer feedback with the structure of the build, rather than treating every check as a separate sequential step.